Home / Blog

Product & Promotional Updates ARMORCOAT

America's # 1 Choice in Epoxy Floor Coating Since 1988

DIY How To?
May 20th, 2015 6:06 pm     A+ | a-

Do-It-Yourself Application Instructions


Armorcoat Floor Coating

Do-it-Yourself Concrete Floor Coatings Kits
Application Instructions

  1. Your first step is to sweep and dust any debris on the floor area you'll be coating. A dry, dust free area is essential to a proper coating. It's also important that the area you're coating is free from serious cracks and damage.
  2. Use a broom and wet-dry vacuum to thoroughly clean debris from the floor. Remove grease with a degreaser and stiff brush. Rinse the degreaser and allow the floor to dry. You may also use a neutral cleaning agent to break up the heavily soiled areas instead of a degreaser. Heavy stains may require a pressure washer.
  3. For the acid wash, mix one part of muriatic acid with six parts of water. Carefully pour the acid into the water, to minimize splashing. Wear eye protection and gloves when working with these liquids. After using muriatic acid, mix a generous amount of baking soda with water and pour it over the floor. This will neutralize the acid. Once you’ve finished the whole floor, give it a thorough rinsing and allow to dry, preferably for 24 to 48 hours with forced ventilation to aid process.
  4. Please refer to your instructions for the mix and application process of your particular kit!*As soon as the epoxy mix is ready, start applying it. You will have no more than two hours to spread the epoxy, and even less time in hot weather. Use a 3-inch paintbrush to cut in along the edges, then use a 9-in, 12-in, and 18-in roller with a 3/8-in. nap roller cover (with extension handle) to spread epoxy on the floor. This work will go quicker if you have a helper handling the cut-in work. Maintain a wet edge by rolling over the edges of previously applied epoxy, and be sure to roll an even coating. Again, a helper can speed this process up. For the second coat, wait at least 12 hours before application.
  5. Apply the topcoat after the basecoat is thoroughly dry. There may be multiple topcoat applications depending on the DIY system you have purchased. Topcoats are chemically resistant and add a nice finish to the floor, especially if you are using decorative flake system, adding a clear urethane topcoat will produce better results.
  6. Let the floor dry! Don’t start walking on the new epoxy surface for at least 24 hours, and plan to wait at least several more days (and preferably a week) before pulling the car back into the garage.

Contact Us today for a Free Quote!

America's # 1 Choice in Epoxy Floor Coating Since 1988 - Call (888) 592-7667

Older Post Home Newer Post

Armorcoat Epoxy Concrete Coatings

Specializing in Residential, Commercial, and Industrial Epoxy Concrete Coatings!
America’s #1 Choice for Epoxy Floor Coatings Since 1988.

Contact Us